Emergency stabilization of an eroding coastal bluff, with sea cave infill and a permanent tieback seawall built from the shore platform up to the existing residential patio.
Waves had eroded the coastal bluff below an oceanfront residence and exposed rapidly eroding sea caves at its base, leaving the slope under the home's patio unsupported. The bluff needed emergency stabilization, and the work area at the base of the bluff was exposed to large tidal swings and storm surge for the duration of the project.
The Solution
J.C. Baldwin excavated and scaled the bluff to a uniform face, filled the sea caves, and built a reinforced shotcrete seawall about 111 feet long and up to 41 feet tall, covering 4,750 square feet. A reinforced cutoff key cut into the underlying bedrock keeps the base of the wall from being undermined. Curved return walls keep waves from working around the ends of the wall, which engineers call flanking. The wall is held by 31 tiebacks up to 50 feet long, each locked off at 115 kips (115,000 pounds). A wave deflector and a permanent safety railing finish the top of the wall at the patio.
Outcome
The sea caves are filled, and the eroding bluff face below the residence is now a permanent, tieback-supported seawall that runs from the shore platform to the patio. The bedrock key protects the base of the wall and the curved return walls protect its ends, the two places where waves most often get behind a seawall.
Wall
~111 ft long x up to 41 ft tall
Shotcrete
4,750 SF, reinforced
Tiebacks
31, up to 50 ft long
Lock-off Load
115 kips
Foundation
Reinforced cutoff key into bedrock
Wall Ends
Curved return walls
Project Gallery
Problem, Solution, and Site Conditions in the Field
Initial conditions: the eroding bluff edge below the residential patio before stabilization. Sea caves undercutting the base of the bluff at the shore platform. Crews excavating the cutoff key at the base of the bluff as reinforcing steel goes up the face. Epoxy-coated reinforcing steel placed across the scaled bluff face and sea cave openings. Vertical reinforcing set above the completed cutoff key at the base of the wall. Storm surge breaking against the bluff during construction. Night work on the beach, with shotcrete placed on the first section and the rest of the face scaled and ready. Scaffolding along the full height of the wall as reinforcing and shotcrete work moves across the face. Tieback bearing plates set in the shotcrete as reinforcing extends across the remaining sea cave. Sculpted shotcrete and tieback plates across the face of the wall, with scaffolding still in place. Reinforcing for the upper wall rising to meet the existing residential patio. Reinforcing cage for a curved return wall, built to keep waves from flanking the end of the wall. The completed seawall, with its sculpted shotcrete face and safety railing along the top.
Related Services
Capabilities Behind This Project
The Pismo Beach seawall project drew on J.C. Baldwin's coastal bluff stabilization, seawall, and sea cave infilling services to stabilize an eroding bluff and protect the residence above it. Learn more about the services involved in Pismo Beach Seawall and Sea Cave Infill:
[{"src":"/baldwin/projects/pismo-beach-seawall/initial-bluff.jpg","alt":"Eroded coastal bluff below a residential patio, with a ladder down the bluff face and surf at its base","caption":"Initial conditions: the eroding bluff edge below the residential patio before stabilization."},{"src":"/baldwin/projects/pismo-beach-seawall/sea-caves.jpg","alt":"Sea caves cut into the base of a coastal bluff at low tide","caption":"Sea caves undercutting the base of the bluff at the shore platform."},{"src":"/baldwin/projects/pismo-beach-seawall/cutoff-key.jpg","alt":"Crew in hard hats excavating at the base of the bluff beside scaffolding and reinforcing steel","caption":"Crews excavating the cutoff key at the base of the bluff as reinforcing steel goes up the face."},{"src":"/baldwin/projects/pismo-beach-seawall/face-reinforcing.jpg","alt":"Green epoxy-coated reinforcing steel placed across the scaled bluff face","caption":"Epoxy-coated reinforcing steel placed across the scaled bluff face and sea cave openings."},{"src":"/baldwin/projects/pismo-beach-seawall/key-and-vertical-steel.jpg","alt":"Six workers at the base of the bluff in front of vertical reinforcing bars rising from a shotcrete base","caption":"Vertical reinforcing set above the completed cutoff key at the base of the wall."},{"src":"/baldwin/projects/pismo-beach-seawall/storm-surge.jpg","alt":"Storm waves breaking against the bluff below the residence during construction","caption":"Storm surge breaking against the bluff during construction."},{"src":"/baldwin/projects/pismo-beach-seawall/night-shotcrete.jpg","alt":"Bluff face lit by work lights at night, with finished shotcrete on one section","caption":"Night work on the beach, with shotcrete placed on the first section and the rest of the face scaled and ready."},{"src":"/baldwin/projects/pismo-beach-seawall/scaffold-progress.jpg","alt":"Multi-level scaffolding along the bluff face with reinforcing steel and shotcrete in progress","caption":"Scaffolding along the full height of the wall as reinforcing and shotcrete work moves across the face."},{"src":"/baldwin/projects/pismo-beach-seawall/tieback-plates.jpg","alt":"Tieback bearing plates set in shotcrete next to reinforcing steel over a sea cave","caption":"Tieback bearing plates set in the shotcrete as reinforcing extends across the remaining sea cave."},{"src":"/baldwin/projects/pismo-beach-seawall/sculpted-face.jpg","alt":"Sculpted shotcrete wall with tieback plates behind scaffolding","caption":"Sculpted shotcrete and tieback plates across the face of the wall, with scaffolding still in place."},{"src":"/baldwin/projects/pismo-beach-seawall/upper-wall-steel.jpg","alt":"Worker on scaffolding beside reinforcing steel along the top of the wall next to the residential patio","caption":"Reinforcing for the upper wall rising to meet the existing residential patio."},{"src":"/baldwin/projects/pismo-beach-seawall/return-wall-cage.jpg","alt":"Curved reinforcing steel cage above the ocean at the end of the wall","caption":"Reinforcing cage for a curved return wall, built to keep waves from flanking the end of the wall."},{"src":"/baldwin/projects/pismo-beach-seawall/completed-wall.jpg","alt":"Completed sculpted seawall below the residence with a railing along the top and crew on the beach","caption":"The completed seawall, with its sculpted shotcrete face and safety railing along the top."}]